Project Description

At the "Saburtalo 2" substation, a relay protection system with a capacity of 44 cells was brought in line with modern standards. Within the framework of the project, complete installation and configuration of relay protection RTU (Remote Terminal Unit) devices were carried out, along with their integration into the existing SCADA system.

These works ensure high reliability, real-time monitoring, and accurate data transmission, which enhance the operational safety and efficiency of the substation.

The work performed included:

  • Installation of RTU devices for 44 cells
  • Individual configuration and parameterization
  • Full integration with the existing SCADA system and signal visualization
  • System testing in both real and simulated modes
  • Personnel retraining and provision of technical documentation